Case Study – LM2500 Gas Turbine Installation

 

Challenge: Integrating multiple auxiliary systems while ensuring safety, reliability, and                                 compliance. Risks included hydraulic instability, poor venting, and late-                                         stage design changes.

 

Approach:

-Full system review including starter, fire fighting, water wash, fuel and diesel systems

- Accurate LM2500 fuel consumption calculations

- Safe and optimized diesel day tank design

- Proper hydraulic and piping design including vent, drain and overflow systems

Key Engineering Focus:

- Stable flow and correct pipe sizing

- Overfill protection and drainage design

- 3-hour full load fuel capacity

- Reliable operation under real conditions 

 

Deliverables: PFD, P&IDs, Equipment Datasheet, Calculations, HAZOP & LOPA                                                  support

 

Results:

- Reliable system integration

- Improved safety and compliance

- Reduced design risk and rework

- Lower lifecycle cost

 

Value: Smart process engineering ensures long-term performance, cost savings, and                          reliable operation.

Contact: Available to support gas turbine and modular skid projects